Dedicated circuit installation in Spokane
The new appliance is bought, or about to be. What's between you and using it is a circuit that doesn't exist yet. We'll check your panel, run the right circuit and hook it up properly.

About dedicated circuits
A lot of what people buy today needs its own circuit: heat pumps and mini-splits, induction ranges, electric dryers and water heaters, chest freezers, garage heaters, welders and shop tools. The installer often says 'you'll need an electrician for that part,' and that's where you get stuck.
We work out what the appliance needs from its installation manual, confirm your panel can supply it, and run a dedicated circuit with the right breaker, wire and disconnect, so the appliance installer can finish and you can use the thing you paid for.
You'll likely need a new circuit for…
- A heat pump or ductless mini-split.
- An induction or electric range, cooktop or wall oven.
- An electric dryer, tankless or heat pump water heater.
- A freezer, garage heater or second refrigerator that keeps tripping a shared circuit.
- Welders, compressors, table saws and other shop equipment.
How it works
- Step 1
Read the nameplate
We size the circuit from the appliance's installation instructions and nameplate, not a rule of thumb.
- Step 2
Check the panel
Breaker space and service capacity are checked. If the panel is tight, we'll show you the options.
- Step 3
Run the circuit
Wire, breaker, receptacle or disconnect, routed cleanly and protected, indoors or out.
- Step 4
Permit and inspection
New circuits are permitted and inspected, and we coordinate timing with your appliance or HVAC installer.
Code, safety and permits
Done to the appliance's requirements
Matched to the manual
Breaker size, wire size and receptacle type match what the manufacturer specifies.
Disconnects where required
Outdoor units like heat pumps get a disconnect within sight, sealed and weather-rated.
Protection where required
GFCI or arc-fault protection where the code calls for it.
Coordinated with other trades
We work around your HVAC, plumbing or appliance installer's schedule.
What affects a dedicated circuit
Size of the load
A 240-volt heat pump circuit is a different job from a 120-volt freezer circuit.
Distance from the panel
Longer runs and finished spaces take more work.
Panel capacity
Some homes need a subpanel or service upgrade to add big loads.
Indoor or outdoor
Outdoor equipment needs weather-rated materials.
Questions people ask about dedicated circuits
Can I just plug a new appliance into an existing outlet?
Only if the manufacturer allows it and the circuit can carry it. Many appliances specify a dedicated circuit, and large ones need 240 volts. We'll check.
My HVAC company is installing a heat pump. Do they do the electrical?
Some do, many don't. We're happy to work alongside your HVAC installer and handle the circuit and disconnect.
Does a new circuit need a permit?
Yes. New circuits are permitted work: through the City of Spokane inside the city, and usually Washington L&I elsewhere. We pull the permit and schedule the inspection.
Ready when you are
Tell us about your project.
Rather talk it through?
(509) 808-1925