Skip to content
Acorn Electric

Electrical for remodels and additions in Spokane

You can picture the finished kitchen, the new bathroom or the covered patio. We help you get the lighting, outlets and circuits right while the walls are open, so it works the way you imagined when it's done.

New covered patio with a wood ceiling, recessed lights and a ceiling fan

About remodels & additions

The electrical in a remodel is mostly invisible when it's finished, which is exactly why it's easy to get wrong. An outlet in the wrong place, a dark corner of the counter, a fan on the same circuit as the microwave: these are the things people live with for years.

We walk the space with you before anything is roughed in, talk through how you'll actually use it, and plan lighting, outlets and circuits around that. Then we wire it properly, get it inspected before the walls close, and come back to trim it out once the finishes are in.

Projects we wire

  • Kitchen remodels: lighting, island outlets, appliance circuits, under-cabinet lights.
  • Bathroom remodels: fans, heated floors, lighting and GFCI protection.
  • Basement finishes and bonus rooms.
  • Room additions and covered patios or decks.
  • Garage and shop conversions.

How a remodel job runs

Remodels work best when the electrician is involved before the framing is finished.

  1. Step 1

    Walk it and plan it

    We go through the space with you (and your contractor, if you have one) and mark out lighting, outlets and switches.

  2. Step 2

    Check capacity

    New kitchens and additions add load. We confirm the panel and service can carry it, and say so early if they can't.

  3. Step 3

    Permit and rough-in

    We pull the permit, rough in the wiring and get the rough-in inspection before insulation and drywall.

  4. Step 4

    Trim-out and final

    Once finishes are in, we install fixtures and devices, test everything and get the final inspection.

Code, safety and permits

What we pay attention to

What shapes a remodel job

Questions people ask about remodels & additions

Do you work with general contractors?

Yes. We're happy to work as part of your contractor's team, or directly with you if you're managing the project yourself.

When should I call an electrician in a remodel?

Before framing is finished, ideally during planning. It's far easier to put things in the right place before the walls close.

Does a remodel need an electrical permit?

Almost always. Rough-in is inspected before the walls close, then again once fixtures are in. Permits go through the City of Spokane inside the city, and usually Washington L&I elsewhere. We pull the permit.

Ready when you are

Tell us about your project.

Send the details and any photos you have about remodel and addition electrical. We'll get back to you to discuss the project.

Rather talk it through?

(509) 808-1925

Request service

Fields marked Optional can be left blank. Everything else is needed to send.

Best way to reach you

We'll call you back, so a phone number is needed. Email is optional.

So we can confirm we cover your area.

What's happening or what you'd like done. A sentence or two is plenty.

Up to 5 files: JPG, PNG, WebP photos or PDF. 4 MB total. Photos are resized automatically. A panel photo, charger model or spec sheet helps us quote.

Prefer to talk? (509) 808-1925

We use these details and files only to respond to your request. Privacy