Electrical panel and service upgrades in Spokane
Out of breaker space, dealing with an outdated panel, or adding equipment that needs more power? We check whether you need a panel replacement, a service upgrade, or a smaller change.

200 amp service upgrades and more power
A panel replacement changes the box on the wall. A service upgrade changes how much power the whole house can pull from the utility: the meter base, the service conductors, the main breaker and often the mast. Plenty of Spokane homes still run on 100-amp service or less, which was generous when they were wired and is tight today.
- A load calculation first: We add up what the house uses now and what you're planning, and confirm a service upgrade is actually the right answer. Sometimes load management or a smaller change will do.
- Permit and utility coordination: We pull the electrical permit and work with Avista or Inland Power & Light, whichever serves your address, on the disconnect, any new meter and the reconnect.
- New service equipment: Meter base, service conductors, main breaker or panel, and the mast or underground connection as the job requires, installed to the code as adopted in Washington.
- Grounding, bonding and surge protection: The grounding electrode system is brought up to what the new service needs, and current code calls for a surge-protective device whenever a home's service is replaced or upgraded.
- Inspection and reconnection: The work is inspected, the utility restores power, and we check that every circuit in the house came back as it should.
About panel & service upgrades
Panels rarely fail all at once. More often you notice it a piece at a time: no space for a new breaker, an older fuse box an insurer has flagged, or an electrician telling you the EV charger you want won't fit.
A panel upgrade can mean replacing the panel itself, increasing the size of your electrical service (commonly 100 to 200 amps), or both. Which one you need depends on what you're adding and what's there now. That's the first conversation we have.
Signs your panel is due for attention
- There's no room for new breakers, or you see breakers doubled up on one slot.
- You still have a fuse box, or a panel brand an inspector or insurer has flagged.
- Breakers trip often, feel warm, or the panel buzzes.
- You're adding an EV charger, hot tub, heat pump, shop or ADU.
- You're buying or selling an older home and the inspection raised the panel.
How a panel or service upgrade works
Panel work touches the point where power enters your home, so it's planned carefully and coordinated with your utility when the service is involved.
- Step 1
Assess what you have and what you'll add
We look at the existing panel, service size, grounding and the loads you're planning, then recommend the smallest upgrade that actually solves the problem.
- Step 2
Permit and utility coordination
Panel and service work needs an electrical permit. When the service is being changed, the power is disconnected and reconnected by your utility, and we schedule that with them.
- Step 3
Replace and reconnect
The new panel goes in, existing circuits are reconnected and labeled clearly, and grounding and bonding are brought up to what the job requires.
- Step 4
Inspection and power-up
The work is inspected, power is restored, and we check that everything in the house came back on as it should.
Code, safety and permits
What a careful panel job looks like
Most of a panel upgrade is out of sight once the cover is on. These are the parts we don't skip.
Grounding and bonding
The new panel is only as safe as its connection to ground. We verify the grounding electrode system and bonding as part of the job.
A directory you can read
Every breaker labeled with what it actually feeds, so the next time something trips, you know which one.
Room to grow
We size and lay out the panel so the next addition doesn't mean another upgrade.
Weather-tight outside
Where the job includes the meter base or service entrance, exterior penetrations are sealed against Spokane's freeze-thaw winters.
What shapes the scope of a panel upgrade
Panel only or full service
Swapping a panel at the same amperage is simpler than increasing the size of your service.
Condition of the mast and meter base
If those need replacing too, the job grows. We'll tell you up front.
Utility scheduling
Service changes depend on your utility's disconnect and reconnect.
Existing wiring
Old circuits sometimes need correcting before they can land in a new panel.
Questions people ask about panel & service upgrades
Do I need a new panel or a service upgrade?
A panel replacement swaps the box and breakers that distribute power. A service upgrade increases how much power the property can draw from the utility, and can also involve the meter, service conductors and utility connection. If you're out of breaker space but not capacity, you may only need the first. A load calculation tells us which.
Do panel upgrades in Spokane need a permit?
Yes. Panel and service work needs an electrical permit and inspection: through the City of Spokane inside the city, and usually Washington L&I elsewhere. We pull the permit.
Will my power be off during the upgrade?
For part of the day, yes. When the service is changed your utility disconnects and reconnects power. We'll tell you the plan ahead of time so you can prepare.
My insurer flagged my panel brand. Is it really a problem?
Some older panel lines, such as Federal Pacific Stab-Lok and Zinsco, have well-documented reliability concerns, and many insurers and home inspectors flag them. We'll look at yours and tell you honestly what we see.
Ready when you are
Tell us about your project.
Rather talk it through?
(509) 808-1925